Installation and commissioning of gas turbines

LLC Russ-Turbo carries out gas turbine equipment commissioning with the development of working and operational documentation. Our specialists are highly qualified and use modern high-tech equipment. 

  • Commissioning is carried out in stages with sequential adjustment of the main gas turbine systems:
  • Lubrication and hydraulic lifting system
  • Hydraulic part of the control system
  • Electronic part of the control system
  • Ignition gas system
  • Liquid fuel system
  • Gaseous fuel system
  • Compressed air system

The set of commissioning works includes:

  1. Conducting equipment analysis, analysis and adjustment of P&I diagram developed by equipment suppliers
  2. Development of setting maps, protections, blockings for gas turbine equipment
  3. Development of operational documentation (instructions, operational diagrams, log of settings, protections, blocking)
  4. Development of commissioning programs for gas turbine installation
  5. Installation control for the gas turbine and auxiliary equipment
  6. Comprehensive adjustment of gas turbine systems (flushing, pneumatic testing, hydraulic testing, equipment running-in, checking pressure-flow characteristics, vibration diagnostics, functional testing of systems)
  7. Technological support for algorithms adjusment (protections, interlocks, ATS, regulators)
  8. Gas turbines intallation commissioning on gaseous and liquid fuels
  9. Testing on a gas turbine

We carry out testing and adjustment of gas turbines combustion on gaseous and liquid fuels during repair work or "hot" adjustment during installation.