LLC Russ-Turbo carries out gas turbine equipment commissioning with the development of working and operational documentation. Our specialists are highly qualified and use modern high-tech equipment.
- Commissioning is carried out in stages with sequential adjustment of the main gas turbine systems:
- Lubrication and hydraulic lifting system
- Hydraulic part of the control system
- Electronic part of the control system
- Ignition gas system
- Liquid fuel system
- Gaseous fuel system
- Compressed air system
The set of commissioning works includes:
- Conducting equipment analysis, analysis and adjustment of P&I diagram developed by equipment suppliers
- Development of setting maps, protections, blockings for gas turbine equipment
- Development of operational documentation (instructions, operational diagrams, log of settings, protections, blocking)
- Development of commissioning programs for gas turbine installation
- Installation control for the gas turbine and auxiliary equipment
- Comprehensive adjustment of gas turbine systems (flushing, pneumatic testing, hydraulic testing, equipment running-in, checking pressure-flow characteristics, vibration diagnostics, functional testing of systems)
- Technological support for algorithms adjusment (protections, interlocks, ATS, regulators)
- Gas turbines intallation commissioning on gaseous and liquid fuels
- Testing on a gas turbine
We carry out testing and adjustment of gas turbines combustion on gaseous and liquid fuels during repair work or "hot" adjustment during installation.